Quality System
Quality System & Standards
The standards, traceability and management arrangements that govern the work described on this site.
Overview
Calibration and performance verification work is performed by laboratories accredited to ISO/IEC 17025:2017. Accreditation is held by the performing laboratory, and certificates are issued under that laboratory's accredited scope. Each request is scoped against the published scope of accreditation before work is booked, so the specific measurement, range and reported uncertainty are checked against the instrument rather than assumed from the quote alone.

Standards Referenced
Work described on this site is performed under ISO/IEC 17025:2017.
Where accreditation appears on this site it refers to the performing laboratory's own accreditation, limited to the measurements in its published scope. Requests that fall outside that scope are accepted where the capability exists, reported as non-accredited, and identified as such on the certificate. Every accreditation named here belongs to the laboratory performing the measurement.
The documentation a quotation arrives with is explained on the accreditation documentation page.

Metrological Traceability
Measurements are traceable to the SI through NIST, with each certificate stating the reference standards used and the measurement uncertainty reported. Where a result does not fall within an accredited scope, it is identified separately on the quote and certificate as non-accredited work and kept off the accredited results. Decision rules applied to any statement of conformity are stated on the certificate, consistent with ISO/IEC 17025:2017's requirement that the rule be documented. Where adjustment or repair occurs, both before and after results are reported, giving the basis for any reverse-traceability impact assessment a buyer needs to run against parts accepted since the prior calibration. Supplier-quality clauses such as ANSI/NCSL Z540.3-2006 govern the calibration programme itself — guard banding and the 2% probability-of-false-accept rule — and the requirements of that clause are addressed in the quotation where a purchase order cites it.
Each measurement carries its own traceability record rather than a blanket statement: the certificate identifies the reference used, that reference's calibration status, and the documented chain linking it to the SI unit. If a reference is later found out of tolerance, everything measured against it since its last calibration is reviewed and the affected customers are told.
Equipment and Maintenance
Equipment categories handled include bridge, gantry and cantilever coordinate measuring machines, portable articulated arms, granite surface plates, gauge blocks, and ring and plug gauges. Documented procedures govern request review, method selection against the applicable standard, result review and release, and a complaints-and-appeals process available to any customer who disputes a result or a certificate's content. Out-of-tolerance findings are reported with as-found data intact and before any correction is applied, and records are retained in a form that can be retrieved on request for an audit.
References are uniquely identified, environmentally controlled, and recalibrated to a defined schedule that drift data can shorten but not quietly extend. Damaged, overloaded or questionable equipment is removed from service and labelled until it has been verified and formally released back into use.
Management System
The work sits inside a documented management system:
- 01
Controlled documents
Procedures carry issue and revision status.
- 02
Retained records
Retained for a defined period and retrievable against a certificate number.
- 03
Audit and review
Internal audit and management review run on a schedule.
- 04
Corrective action
Nonconforming work and improvement actions are tracked to closure, and their effectiveness is checked afterwards.
Impartiality and Complaints
Where impartiality could be compromised the risk is identified and controlled, and the reported result follows the measurement rather than the commercial interest. Complaints and appeals are a formal input to the system — the process, including the response commitment, is set out on the complaints policy page. How results should and should not be read is covered on the disclaimer page.

Compiling records for a supplier-qualification file?
Scope, method statements and traceability detail are supplied with the quotation.